After racing at NJMSP last weekend, I'm looking forward a similarly fun drivers track a little closer to home than 7 hours, FUN track, great facility, just no good way to get there from Western Massachusetts.
NYS Thruway 87 / 287 at NY/NJ border (Suffern / Mahwah)
287 S to Somerville / Bridgewater
202 S to Flemington
31 S to Pennington
295 S to the mess by Camden and then onto NJMP
no tolls in NJ this way
Ed, sorry I missed this thread yesterday. It is all good. At the NER BOD’s direction we are working with a core investor to finish this project. The design has been refined to increase runoff areas and meet higher safety levels. We are currently in the process of getting these alterations approved. Most of the engineering work required is based on the new stricter stormwater runoff standards. While my ability to predict timelines has been less than perfect I believe we will start construction in the spring.
2009 was a challenging year. The financial climate slowed things to a crawl. Final engineering has in the last 90 days finally picked up. NER is financially sound. Current deal requires closing by 6/30/2010. Full report at NER Annual Meeting 1/23.